Promat offers a versatile and diverse range of products, including Promat SUPALUX® with fire protection from 30 minutes through to 4 hours resistance for ceiling, floor and roof applications.
For industrial wall and roof linings see Promat FLAMEBRAKER™ GRID. For thermal upgrade of concrete floors please refer to Promat TL Board®.
Choose from the criteria below to find the best board solutions to fit your needs.
To compare up to four systems, click the compare button

for the systems that you are interested in.

30
4.10.1
30 minute new ceiling lining

120
4.10.10
120 minute new ceiling lining

120
4.10.11
120 minute new ceiling lining

120
4.10.12
120 minute new ceiling lining

60
4.10.5
60 minute new ceiling lining

60
4.10.6
60 minute new ceiling lining

60
4.10.7
60 minute new ceiling lining

90
4.10.8
90 minute new ceiling lining

90
4.10.9
90 minute new ceiling lining

30
4.100.1
30 minute suspended ceiling

60
4.100.2
60 minute suspended ceiling

60
4.100.3
60 minute concealed grid ceiling

60
4.110.1
60 minutes integrity only fire from below

120
4.110.2
120 minutes fire from below (integrity only)

60
4.110.3
60 minutes fire from above & below (integrity only)

120
4.110.4
120 minutes fire above & below (integrity only)

60
4.110.5
60 minutes fire from above & below

120
4.110.6
120 minutes fire from above & below

60
4.20.1
60 minutes fire from above and below

60
4.20.2
60 minutes upgrade from below

30
4.30.1
30 minutes upgrade from above

60
4.30.2
60 minutes upgrade from above

30
4.40.1
30 minute timber roof void

60
4.40.2
60 minute timber roof void

120
4.40.3
120 minute timber roof void

30
4.50.1
30 minute steel joist mezzanine floor

60
4.50.2
60 minute steel joist mezzanine floor

90
4.50.3
90 minute steel joist mezzanine floor

120
4.50.4
120 minute steel joist mezzanine floor

240
4.60.1
240 minute reinforced concrete floor

240
4.60.2
240 minute reinforced concrete floor

60
4.70.1
60 minute protection to steel beam

90
4.70.2
90 minute protection to steel beam

120
4.70.3
120 minute protection to steel beam

30
4.80.1
30 minute protection to steel beam

60
4.80.2
60 minute protection to steel beam

60
4.90.1
60 minute membrane ceiling

120
4.90.2
120 minute membrane ceiling

240
4.90.3
240 minute membrane ceiling